The furring and framing has begun on the south west (Sweet Frog) corner of the building. This corner will be stone at the bottom and then a modern metal siding from 4' the rest of the way up. The top will have a faux roof.

 

DEMO

 The last of the demolition of the red roof continues on the east side and should be wrapped up by early next week. The demolition of the old bank drive thru will require more time to remove the concrete and patch the pavement.

 

 

DRYVIT

Dryvit work will begin next week on the west side of the building. This involves cutting a Styrofoam type board, so you might see some tiny white Styrofoam specks flying around, so don't worry, snow has not arrived yet! They have been instructed to be a clean and neat as possible.

 

 

 

Share on Facebook
Share on Twitter
Please reload

Featured Posts

Almost there!

December 30, 2016

1/1
Please reload

Recent Posts

December 30, 2016

December 6, 2016

November 2, 2016

October 18, 2016

October 13, 2016

September 26, 2016

Please reload

Archive
Please reload

Search By Tags

I'm busy working on my blog posts. Watch this space!

Please reload

Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

© 2016 Cedar Cliff, LP