EIFS begins

October 18, 2016

The EIFS/Dryvit contract has begun installing the Styrofoam panels on the west side of the building. Once the panels are up, they will cover them with a mesh, followed by a stucco type finish.

 

 

DEMOLITION

The demolition is just about complete on the east side. The crew will soon begin framing the raised portion of the roof on that side of the building.

 

 

SIGNAGE

If you have not been in touch with Continental Signs to discuss your channel letter sign, please let me know. You will want to make sure that your get your sign squared away sooner rather than later so that it is really for installation as soon as the façade is finished. ryan@pennstatemanagement.com

 

 

Share on Facebook
Share on Twitter
Please reload

Featured Posts

Almost there!

December 30, 2016

1/1
Please reload

Recent Posts

December 30, 2016

December 6, 2016

November 2, 2016

October 18, 2016

October 13, 2016

September 26, 2016

Please reload

Archive
Please reload

Search By Tags

I'm busy working on my blog posts. Watch this space!

Please reload

Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

© 2016 Cedar Cliff, LP