EIFS begins

The EIFS/Dryvit contract has begun installing the Styrofoam panels on the west side of the building. Once the panels are up, they will cover them with a mesh, followed by a stucco type finish.

DEMOLITION

The demolition is just about complete on the east side. The crew will soon begin framing the raised portion of the roof on that side of the building.

SIGNAGE

If you have not been in touch with Continental Signs to discuss your channel letter sign, please let me know. You will want to make sure that your get your sign squared away sooner rather than later so that it is really for installation as soon as the façade is finished. ryan@pennstatemanagement.com


Featured Posts
Recent Posts
Archive
Search By Tags
No tags yet.
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square